← Lab /Systems

DoS and delay attacks raise AMI latency and can cost up to $5,097 per day

DoS and time-delay attacks on AMI increase communication latency and cause daily economic losses of up to $5,097

Systems arXiv 10 Aug 2026 Measurement Simulation evidence

Published as “Economic Impact Assessment of Denial-of-Service and Time-Delay Attacks on Advanced Metering Infrastructure”

Why it matters

Utilities should consider strengthening AMI communication reliability and redundancy, as large-scale packet-loss attacks could impose hundreds of thousands of dollars in daily costs.

Summary

The paper estimates that communication degradation affecting 10,000 smart meters can cost utilities about $1,009 per day under normal market prices and up to $5,097 per day during high-price events, scaling to $151,300-$764,600 per day for a 1.5 million-meter deployment. These costs are derived from measured timeout rates (5.31% in a 50% packet-loss scenario) combined with ISO-NE real-time electricity prices. However, delay-only attacks increase latency without causing timeouts, and most requests remain fast (median RTT ~0.18 ms), suggesting the economic impact may be limited to loss-heavy scenarios.

What they found 6

  1. 20% packet loss causes 28 timeout events and an average RTT of ~47 ms.

    “Under a packet loss rate of 20%, 28 timeout events are recorded, accompanied by an average RTT of approximately 47 ms.”

  2. 50% packet loss causes 87 timeout events.

    “a more severe scenario with 50% packet loss is implemented, resulting in a higher timeout occurrence of 87 recorded events.”

  3. Combined 500 ms delay and 20% loss yields 104 timeouts and average RTT ~51.4 ms.

    “A total of 104 timeout events are recorded, with an average RTT of approximately 51.4 ms.”

  4. Data-concentrator failure raises timeout rate to 4.5% (104/2,311 requests) but maintains overall availability.

    “When one concentrator becomes unavailable, the number of timeout events increases to 104 out of 2,311 requests (4.50%), the majority of which (102) occur on the affected concentrator.”

  5. Economic impact for 10,000 meters is $1,009/day at $59.38/MWh and $5,097/day at $300/MWh; scaling to 1.5 M meters yields $151,300-$764,600/day.

    “For 10,000 affected meters, the estimated economic exposure was approximately $1,009 per day at $59.38/MWh and $5,097 per day at $300/MWh.”

  6. Scaling the 10,000-meter estimate to 1.5 million meters increases daily cost to $151,300 and $764,600 respectively.

    “When extrapolated to 1.5 million meters under the same assumptions, these estimates increased to approximately $151,300 and $764,600 per day, respectively.”

Caveats 5

  • Delay-only attacks increase latency but cause only a single timeout, indicating limited impact on data availability: "delay-based attacks primarily affect communication latency without immediately compromising data availability."
  • Most requests remain fast despite high average RTTs, as the median RTT stays around 0.18 ms in every scenario: "the median RTT stays around 0.18 ms in every scenario, even when the average rises to 47 - 69 ms."
  • The reduced-scale topology is selected due to computational feasibility limitations and the complexity of reproducing highfidelity large scale AMI environments.
  • utilities can mitigate part of the effect of missing data through interpolation, historical load profiles, or other data estimation methods, which are not addressed in this study.
  • the reported values should be interpreted as a conservative order-of-magnitude estimate rather than an exact prediction

What’s new here 4

  • Quantifies the economic impact of AMI communication degradation using real-time market prices.
  • Uses a Mininet-based emulation of AMI with a DNP3-inspired UDP model to generate realistic attack scenarios.
  • Evaluates a dual-redundant concentrator architecture for resilience against data-concentrator failures.
  • Extrapolates small-scale experimental results to regional-scale deployments (10 k-1.5 M meters).